For Builders in Redcar

20 jobs just hit Redcar planning. None of those homeowners know you exist yet.

PlanPost turns new planning applications into construction leads in Redcar: we spot each relevant application the day it's filed, then print and post a branded letter from you to the homeowner before they've even started looking for a builder. Review each lead, or set it to auto-send the lot. Your letter lands on a doormat before anyone else's van turns up.

  • 20 applications in Redcar in the last 90 days
  • Letters printed and posted for you, via Royal Mail
  • From £39/mo, cancel anytime
Updated this morning · Letters included · Cancel anytime
Live data

Live leads in Redcar you could be winning

Sample of the planning applications builders are quoting on right now. Last 90 days.

20 live applicationsMostly Extensions (7)Updated this morning

13 of 20 shown below, anonymised to street level. Subscribe to get every new lead with full details, plus a starter batch the day you sign up.

Start receiving leads

Granville TerraceTS10

Change of use of existing residential dwelling (Use Class C3) to children's residential home (Use Class C2)

Conversion
0.6 mi3 weeks ago23 Sept

Granville TerraceTS10

Change of use of existing residential dwelling (Use Class C3) to children's residential home (Use Class C2)

Conversion
0.6 mi3 weeks ago23 Sept

Hornleigh GroveTS10

Single storey extension at rear extending 3.67 metres beyond the rear wall of the original house; maximum height of 3.56 metres; height to eaves 2.35 metres

ExtensionSingle StoreyRear Extension
0.6 mi3 weeks ago21 Sept

Zetland RoadTS10

Demolition of existing single storey extension at side; construction of proposed single storey side extension

ExtensionSingle StoreySide ExtensionDemolition
1.1 mi3 weeks ago17 Sept

Harmony House 182-184 Coatham RoadTS10

Demolition of existing garage; erection of single storey amenity building

HeritageSingle StoreyDemolition
0.6 mi1 month ago11 Sept

Roseberry RoadTS10

Demolition of attached garage, side porch and rear conservatory; construction of two storey side extension and front porch; resurfacing to driveway to create additional parking

ExtensionTwo StoreySide ExtensionFront Extension
1.2 mi1 month ago10 Sept

High StreetTS10

Prior Approval for the change of use of the first and second floors from Class E (commercial) to Class C3 (dwellinghouses) comprising 6 self contained residential apartments

ConversionPrior Approval
0.1 mi1 month ago19 Aug

Alfred StreetTS10

Side extension to create new garage/storage area; remove and rebuild rear outbuilding to create a garden room

ExtensionOutbuildingSide ExtensionGarden Office
0.3 mi2 months ago13 Aug

Redcar LaneTS10

Single storey extension at rear extending 5.00 metres beyond the rear wall of the original house; maximum height of 3.69 metres; height to eaves 2.40 metres

ExtensionSingle StoreyRear Extension
0.9 mi2 months ago11 Aug

Cedar GroveTS10

Single storey rear extension

ExtensionSingle StoreyRear Extension
0.6 mi2 months ago5 Aug

High StreetTS10

Prior Approval for the conversion of the existing first floor and second floors to four apartments on each floor total 8 dwellings and with separate entrance at ground floor

New BuildConversionPrior ApprovalMajor Development
0.2 mi2 months ago4 Aug

Swanage DriveTS10

Demolition of existing conservatory; single storey rear extension

ExtensionSingle StoreyRear ExtensionConservatory
1.8 mi2 months ago31 Jul
Show 1 more applications

Cranbourne DriveTS10

Detached garden building for beauty treatment business

OutbuildingGarden Building
1.9 mi2 months ago29 Jul

12-month application volume

Redcar sees between 3 and 12 planning applications per month (averaging 7); recent months are steady.

Local intelligence

Know your patch: what gets built in Redcar, by whom, and who approves it

The patterns behind the leads. Helpful when you're deciding which jobs to chase.

What's being built in Redcar

Application volume by project type, last 90 days.

Extensions
7
Conversions
3
Heritage
1
New builds
1
Outbuildings
1
Applications · 90d
20
vs 23 prior quarter
Approval rate
100%
4 decided
Biggest category
Extensions
7 apps
vs prior 90d
-13%

How Redcar and Cleveland works

Approval rates, decision times and what gets approved most often. Last 12 months.

Redcar and Cleveland

100% of the area
Approval rate
91%
Median decision
8.1 wk

Most approved

  • Listed Building100%
  • Commercial Unit100%
  • Front Elevation100%
The product

From planning application to doormat in 24 hours

Done-for-you letters

Branded letters, printed and posted for you

Upload your logo and letterhead once, or let PlanPost generate one for you. Every matched application triggers a letter personalised with the homeowner's address and the project they applied for. The greeting stays “Dear Homeowner”: we never use their name. Royal Mail, same working day.

“The letters look better than anything I'd have put together myself. One landed on a £72k loft before the homeowner had even spoken to another builder.”
CK
Chris K.
Owner, CSK Property
Oakwood
Construction
EST. 2012 · SHEFFIELD
14 Station Road
Sheffield S7 4RQ
0114 555 0192
The Homeowner
22 Laurel Gardens
Sheffield
S7 1DH
15 April 2026
Re: Your planning application at 22 Laurel Gardens

Dear Homeowner,

Congratulations on submitting your planning application for a loft conversion at 22 Laurel Gardens. It's exciting to see local homeowners investing in improving their properties.

I'm writing to introduce Oakwood Construction, a local building company that specialises in extensions, loft conversions and home improvements across South Sheffield. We've been trading since 2012, and everything we build is carried out by our own team rather than subcontractors, so someone is on your job every day and the work never stalls.

We finished a loft conversion much like yours on Abbeydale Road earlier this year: two bedrooms and a shower room, done in eleven weeks with the family living at home throughout.

I know the two big questions at this stage are what it will really cost and what it's like to live through the build. Those are exactly the things I'd rather set out honestly with you before you commit to anything.

If you'd like to discuss your plans or would welcome a free, no-obligation consultation, I'd be happy to visit at a time that suits you. Call me on 0114 555 0192, or scan the code below to see examples of our recent work.

I look forward to hearing from you.

Kind regards,

Dave Morgan
Director · Oakwood Construction
Scan to see our work
Royal
Mail

How PlanPost works in Redcar

From planning application to letter on the homeowner's doormat, done for you, in 24 hours.

1

We monitor Redcar and Cleveland every day

Every new planning application is pulled in within 24 hours and matched to your project types and working radius. No spam, no irrelevant noise.

Same-day
2

Your branded letter goes in the post

Your letterhead and your chosen letter template, merged with the homeowner's address and project details, then sent by Royal Mail. Printing and postage included.

Done for you
3

You track every lead through to won

A proper sales pipeline. From posted to responded, quoted, and won, with timeline events, notes and deal values so you see what's working.

Real pipeline

Pick a plan and start winning Redcar jobs

Monthly rolling. Letters included in every plan. Cancel or pause anytime.

Starter

£39/mo + VAT

£46.80 inc. VAT

25 letters / month included

Start with Starter

Professional

Most popular

£79/mo + VAT

£94.80 inc. VAT

50 letters / month included

Start with Professional

Business

£149/mo + VAT

£178.80 inc. VAT

100 letters / month included

Start with Business

See full pricing details →

Questions builders ask before they sign up

Your next job is waiting in a planning application today.

PlanPost finds it, writes to the homeowner, and puts you first in the queue while you're on site.

No contract · Cancel anytime · 14-day satisfaction guarantee