For Builders in Horley

34 jobs just hit Horley planning. None of those homeowners know you exist yet.

PlanPost turns new planning applications into construction leads in Horley: we spot each relevant application the day it's filed, then print and post a branded letter from you to the homeowner before they've even started looking for a builder. Review each lead, or set it to auto-send the lot. Your letter lands on a doormat before anyone else's van turns up.

  • 34 applications in Horley in the last 90 days
  • Letters printed and posted for you, via Royal Mail
  • From £39/mo, cancel anytime
Updated this morning · Letters included · Cancel anytime
Live data

Live leads in Horley you could be winning

Sample of the planning applications builders are quoting on right now. Last 90 days.

34 live applicationsMostly Extensions (14)Updated this morning

24 of 34 shown below, anonymised to street level. Subscribe to get every new lead with full details, plus a starter batch the day you sign up.

Start receiving leads

Wolverton GardensRH6

New

Single storey teat extension. Max height 3.80m, height at eaves 2.85m and 6.00m extending beyond the rear wall.

ExtensionSingle Storey
0.4 mi2 days ago12 Oct

Land Rear Of Hillside BungalowRH6

Erection of 8 no. residential dwellings, together with associated access, landscaping, drainage and other associated works

New BuildLandscaping
2.6 mi2 weeks ago30 Sept

Six Acre FarmRH6

Demolition of building. Erection of new dwellinghouse. (Prior Approval Sch 2, Part 20 Class ZA)

New BuildDemolitionPrior Approval
2.5 mi2 weeks ago29 Sept

Brighton RoadRH6

Conversion of ground floor store to form office accommodation.

Conversion
0.3 mi2 weeks ago29 Sept

Castle DriveRH6

Single storey rear extension following demolition of existing conservatory.

ExtensionSingle StoreyRear ExtensionConservatory
1.0 mi2 weeks ago28 Sept

Haroldslea DriveRH6

Demolition of existing buildings and erection of 40 homes, including affordable housing, with access from Haroldslea Drive and associated parking and open space. Variation of condition 15 of appeal p…

New BuildDemolitionVariation of Condition
1.1 mi2 weeks ago24 Sept

Woodside CrescentRH6

Erection of single storey extension to rear elevation

ExtensionSingle StoreyRear Elevation Change
2.2 mi3 weeks ago21 Sept

Mole EndRH6

Erection of rear extension which would extend beyond the rear wall of the original house by 7.60 metres, for which the maximum height would be 2.60 metres, and for which the height of the eaves would…

ExtensionRear Extension
3.0 mi3 weeks ago17 Sept

Hutchins WayRH6

Part ground floor and first floor rear extension, alterations to roof and associated external alterations with materials to match existing.

ExtensionRear ExtensionFirst Floor ExtensionExternal Alterations
0.6 mi1 month ago11 Sept

RiversideRH6

Single storey rear extension. Max height 3.3m, height at eaves 3m and extending 6m beyond the rear wall.

ExtensionSingle StoreyRear Extension
0.7 mi1 month ago1 Sept

New RoadRH6

Erection of single storey extension, side dormer and garage

ExtensionLoftOutbuildingSingle StoreyDormerNew/Detached Garage
2.5 mi1 month ago1 Sept

Whisperer Villa Yattendon RoadRH6

Loft conversion.

LoftLoft Conversion
0.5 mi1 month ago27 Aug
Show 12 more applications

The SanctuaryRH6

Erection of single storey side & rear extensions.

ExtensionSingle StoreyRear Extension
2.8 mi1 month ago19 Aug

WestleasRH6

Two storey side extension. Associated internal alterations

ExtensionTwo StoreySide ExtensionInternal Alterations
0.7 mi1 month ago18 Aug

Bremner AvenueRH6

Conversion of garage to utility and store, and of store to a study with a replacement flat roof and associated alterations.

ConversionFlat RoofFlat Conversion
0.3 mi2 months ago14 Aug

Redehall CottageRH6

Erection of 2-storey side extension. Installation of Velux windows.

ExtensionTwo StoreySide ExtensionRoof Light/Velux
2.9 mi2 months ago13 Aug

Massetts RoadRH6

Extension & refurbishment of existing building and change of use from the former police station (Use Class sui generis) to 2No x 10 bed (Use Class sui generis) & 1No x 6 bedroom (Use Class C4) house…

ExtensionHMO ConversionSui Generis Use ClassChange of Use Class
0.4 mi2 months ago5 Aug

Brocklehurst WayRH6

Loft conversion with roof windows. As amended on 20/08/2026.

LoftLoft Conversion
0.9 mi2 months ago5 Aug

Cams Farm Sideways LaneRH6

Erection of a two storey rear extension, 2 No. dormer windows to front roof slope, new front entrance porch, alterations to existing side projection and erection of detached garage with workshop with…

ExtensionLoftOutbuildingTwo StoreyRear ExtensionDormer
1.0 mi2 months ago3 Aug

Fermoy Sideways LaneRH6

Certificate of Lawfulness for the proposed development in respect of the erection of 1 No. rear dormer window and insertion of 3 No. roof lights to front to facilitate loft conversion.

LoftDormerLoft Conversion
0.8 mi2 months ago29 Jul

Fermoy Sideways LaneRH6

Prior Notification for the erection of a single storey rear extension of 5 metres deep and 3.4 metres high with a height to the eaves of 2.55m.

ExtensionSingle StoreyRear ExtensionPrior Notification
0.8 mi2 months ago29 Jul

Grove RoadRH6

New single-storey side and rear extension

ExtensionSingle StoreyRear Extension
0.5 mi2 months ago27 Jul

Six Acre FarmRH6

Prior approval for demolition of a former workshop building and construction of a new dwellinghouse in its place (General Permitted Development) (England) Order 2015 (as amended) - Schedule 2, Part 2…

New BuildDemolitionPrior Approval
2.5 mi2 months ago27 Jul

Land South Of Kennel LaneRH6

Erection of 20 No. dwellings and associated parking and landscaping with access from Kennel Lane.

New BuildLandscaping
0.9 mi2 months ago24 Jul

12-month application volume

Horley sees between 8 and 25 planning applications per month (averaging 16); recent months are easing.

Local intelligence

Know your patch: what gets built in Horley, by whom, and who approves it

The patterns behind the leads. Helpful when you're deciding which jobs to chase.

What's being built in Horley

Application volume by project type, last 90 days.

Extensions
14
New builds
5
Loft conversions
3
Conversions
2
Applications · 90d
34
vs 58 prior quarter
Approval rate
78%
9 decided
Biggest category
Extensions
14 apps
vs prior 90d
-41%

How councils in Horley compare

Approval rates, decision times and what gets approved most often. Last 12 months.

Reigate

60% of the area
Approval rate
85%
Median decision
8.0 wk

Most approved

  • Porch100%
  • Render Cladding100%
  • Infill100%

Tandridge

22% of the area
Approval rate
83%
Median decision
8.0 wk

Most approved

  • Hip To Gable100%
  • External Alterations100%
  • Roof Light100%
The product

From planning application to doormat in 24 hours

Done-for-you letters

Branded letters, printed and posted for you

Upload your logo and letterhead once, or let PlanPost generate one for you. Every matched application triggers a letter personalised with the homeowner's address and the project they applied for. The greeting stays “Dear Homeowner”: we never use their name. Royal Mail, same working day.

“The letters look better than anything I'd have put together myself. One landed on a £72k loft before the homeowner had even spoken to another builder.”
CK
Chris K.
Owner, CSK Property
Oakwood
Construction
EST. 2012 · SHEFFIELD
14 Station Road
Sheffield S7 4RQ
0114 555 0192
The Homeowner
22 Laurel Gardens
Sheffield
S7 1DH
15 April 2026
Re: Your planning application at 22 Laurel Gardens

Dear Homeowner,

Congratulations on submitting your planning application for a loft conversion at 22 Laurel Gardens. It's exciting to see local homeowners investing in improving their properties.

I'm writing to introduce Oakwood Construction, a local building company that specialises in extensions, loft conversions and home improvements across South Sheffield. We've been trading since 2012, and everything we build is carried out by our own team rather than subcontractors, so someone is on your job every day and the work never stalls.

We finished a loft conversion much like yours on Abbeydale Road earlier this year: two bedrooms and a shower room, done in eleven weeks with the family living at home throughout.

I know the two big questions at this stage are what it will really cost and what it's like to live through the build. Those are exactly the things I'd rather set out honestly with you before you commit to anything.

If you'd like to discuss your plans or would welcome a free, no-obligation consultation, I'd be happy to visit at a time that suits you. Call me on 0114 555 0192, or scan the code below to see examples of our recent work.

I look forward to hearing from you.

Kind regards,

Dave Morgan
Director · Oakwood Construction
Scan to see our work
Royal
Mail

How PlanPost works in Horley

From planning application to letter on the homeowner's doormat, done for you, in 24 hours.

1

We monitor Reigate and Tandridge every day

Every new planning application is pulled in within 24 hours and matched to your project types and working radius. No spam, no irrelevant noise.

Same-day
2

Your branded letter goes in the post

Your letterhead and your chosen letter template, merged with the homeowner's address and project details, then sent by Royal Mail. Printing and postage included.

Done for you
3

You track every lead through to won

A proper sales pipeline. From posted to responded, quoted, and won, with timeline events, notes and deal values so you see what's working.

Real pipeline

Pick a plan and start winning Horley jobs

Monthly rolling. Letters included in every plan. Cancel or pause anytime.

Starter

£39/mo + VAT

£46.80 inc. VAT

25 letters / month included

Start with Starter

Professional

Most popular

£79/mo + VAT

£94.80 inc. VAT

50 letters / month included

Start with Professional

Business

£149/mo + VAT

£178.80 inc. VAT

100 letters / month included

Start with Business

See full pricing details →

Questions builders ask before they sign up

Your next job is waiting in a planning application today.

PlanPost finds it, writes to the homeowner, and puts you first in the queue while you're on site.

No contract · Cancel anytime · 14-day satisfaction guarantee